VERIFIED PETITION OF DUKE ENERGY INDIANA, INC. FOR AUTHORITY PURSUANT TO AN ALTERNATIVE REGULATORY PLAN AUTHORIZED UNDER IND. CODE SECTION 8-1-2.5 ET SEQ. AND IND. CODE SECTIONS 8-1-2-6.1, 8-1-8.7 AND 8-1-8.8 TO DEFER AND SUBSEQUENTLY RECOVER ENGINEERING AND PRECONSTRUCTION COSTS ASSOCIATED WITH THE CONTINUED INVESTIGATION AND ANALYSIS OF CONSTRUCTING AN INTEGRATED COAL GASIFICATION COMBINED CYCLE ELECTRIC GENERATING FACILITY |